Compliance by state
Electrical Safety Certificates and network notices in Western Australia
Western Australian electrical contractors must lodge a Preliminary Notice before starting prescribed work, a Notice of Completion once it is done, and give the customer an Electrical Safety Certificate, under the Electricity (Licensing) Regulations 1991. Preliminary Notices and Notices of Completion go to the relevant network operator, or to Building and Energy if there is no network operator involved.
Last checked 25 Sep 2026 against the sources listed at the end of this page.
- Official name
- Electrical Safety Certificate, alongside a Preliminary Notice and a Notice of Completion
- Who issues it
- The electrical contractor carrying out the work
- When
- Electrical work requiring notice to a network operator or connection to supply, under the Electricity (Licensing) Regulations 1991
- Deadline
- Building and Energy's public guide states the requirement to provide all three documents but does not itself set out day-count deadlines for each; check eNotice and the relevant network operator's own timing requirements for a specific job
- Lodgement
- Preliminary Notices and Notices of Completion go to the relevant network operator, or to Building and Energy if there is no network operator. All three documents can be lodged electronically through eNotice
- Keep records for
- Not stated in Building and Energy's public guide for licence holders; keep a copy against the job file until you can confirm the current retention period with Building and Energy
- Penalty
- Building and Energy's public guide for licence holders describes the obligation to provide all three documents without stating a specific penalty unit figure for non-compliance. Confirm the current offence and penalty provisions in the Electricity Act 1945 and the Electricity (Licensing) Regulations 1991 with Building and Energy before quoting a number to a client.
Homeowner? If you had electrical work done in WA that connects to the network, your contractor should have lodged a Preliminary Notice before starting and a Notice of Completion afterwards, on top of giving you the Electrical Safety Certificate.
What the certificate must show
- The licensed electrical contractor responsible for the work
- The installation address and the customer's details
- Which of the three documents (Preliminary Notice, Notice of Completion, Electrical Safety Certificate) applies to this stage of the job
- The network operator or Building and Energy, whichever the notice is directed to
Produce it from a ServiceM8 job
- In Settings > Forms > Add Form, create a form called WA electrical notices, with a Choice question Involves network operator connection, Yes or No.
- Add Date questions for Preliminary Notice lodged and Notice of Completion lodged, and a Text question for the network operator or Building and Energy reference used.
- Set a job badge, WA notices required, applied automatically to jobs marked as involving a network connection, so the office can see which stage each job is at.
- Record the eNotice reference number against the job once each document is lodged electronically, so the job diary matches what Building and Energy and the network operator hold.
- Attach the Electrical Safety Certificate PDF to the job diary and email it to the customer the same day the job is signed off.
- Check the relevant network operator's own portal or turnaround expectations for Preliminary Notices before quoting a start date on jobs needing a new connection.
- Run a test job through Preliminary Notice, Notice of Completion and Electrical Safety Certificate stages before your electricians rely on the workflow for real jobs.
Three documents, not one
WA's paperwork is built around the network connection rather than a single certificate. Building and Energy, the state's electrical, gas and plumbing regulator inside the Department of Energy, Mines, Industry Regulation and Safety, requires electrical contractors to provide Preliminary Notices, Notices of Completion and Electrical Safety Certificates as required by the Electricity (Licensing) Regulations 1991, with regulation 49 the key provision. A contractor quoting a straightforward switchboard upgrade needs to plan for all three, not just the certificate the customer sees.
Who gets the notices
Preliminary Notices and Notices of Completion go to the relevant network operator, such as Western Power in most of the state, or to Building and Energy itself where there is no network operator involved in the job. That routing matters for scheduling: a network operator can have its own turnaround and inspection expectations on top of the state's regulatory deadline, so check the operator's own portal requirements as well as the regulation.
eNotice: WA's lodgement system
Building and Energy runs eNotice, a web based facility for electronically lodging Preliminary Notices, Notices of Completion and Electrical Safety Certificates. For a contractor doing regular connection work, getting set up in eNotice removes the paper trail that a Preliminary Notice and Notice of Completion process would otherwise create, and keeps the lodgement history in one place if Building and Energy or a network operator ever asks for it.
The legislation behind the notices
The framework sits across the Electricity Act 1945, the Electricity Regulations 1947 (Part VIII covers the notice and certificate obligations) and the Electricity (Licensing) Regulations 1991, with both sets of regulations taking precedence over other requirements where they apply. If you are unsure which notice a particular job needs, Building and Energy's own guide for licence holders is the reference to check against, not a generic checklist written for another state.
Sources
- Electrical Contractors must provide Preliminary Notices, Notices of Completion and Electrical Safety Certificates for electrical work as required by the Electricity (Licensing) Regulations 1991, with regulation 49 the relevant provision. Both the Electricity Regulations 1947 and the Electricity (Licensing) Regulations 1991 take precedence. Government of Western Australia, Building and Energy, checked 25 Sep 2026.
- Preliminary Notices and Notices of Completion must be completed and provided to the relevant network operator, or to Building and Energy where there is no network operator. Government of Western Australia, Building and Energy, checked 25 Sep 2026.
- eNotice is a web-based facility for the electronic lodgement of Preliminary Notices, Notices of Completion and Electrical Safety Certificates for electrical work. Government of Western Australia, Building and Energy, checked 25 Sep 2026.
- The legislation governing these notices and certificates is the Electricity Act 1945, the Electricity Regulations 1947 (Part VIII) and the Electricity (Licensing) Regulations 1991. Government of Western Australia, Building and Energy, checked 25 Sep 2026.
- Building and Energy can be contacted on 1300 489 099 or be.info@lgirs.wa.gov.au. Government of Western Australia, Building and Energy, checked 25 Sep 2026.